This project includes a 1,109 SF kitchen, a 1,029 SF mercantile, and 112 SF of storage.
12.12.24 - MEP, interior wall, interior ceiling, and Millwork continue. The drives are poured and the drivethrough equipment installation is underway,
11.26.24 - Millwork and MEP work continue. Canopies and the trash gates are installed,
10.25.24 - Electrical and HVAC continue. Crews are taping and floating the interior. Exterior canopy and light installation are underway,
10.16.24 - Interior drywall continues. Additional driveways were poured,
10.10.24 - Electrical and HVAC continue,
10.01.24 - Masonry work is underway. Interior electrical and buildout continues,
9.24.24 - Doors and windows are installed. Electrical is underway,
9.18.24 -
9.04.24 - Crews are framing the building,
8.06.24 - Framing for a pavement pour,
8.02.24 - Crewmen are pouring the building foundation this morning,
6.04.24 - Storm and utility work continue,
5.10.24 - Storm and utility work are underway,
4.17.24 - Sitework continues,
4.02.24 - Crews are excavating and clearing the site,
By accepting you will be accessing a service provided by a third-party external to https://northwindscommercialrealty.com/