Premier Cryogenics | New 26,000 SF 20-ton Crane-served Manufacturing Facility | LaPorte, TX
10.13.22 - Erectors are getting close to closing in the South end of the building,
9.29.22 - Exterior sheeting and interior insulated sheeting are underway,
9.27.22 - Additional paving is poured. M&M Erectors have erected the steel and are installing the wall sheeting,
9.22.22 - Erectors are assembling and lifting the roof sections,
9.19.22 - Erectors are shaking out the steel,
1769 Hits
1769 Hits