20213 Binford Rd

20213 Binford Rd | 20,000 SF Trade School | Waller, TX

6.02.22 - Crewmen are addressing punch out items and the project will be completed by next week,

IMG 6814

IMG 6824

IMG 6822

IMG 6824

IMG 6828

IMG 6832

IMG 6839

IMG 6844

IMG 6846

IMG 6855

IMG 6863

IMG 6865

IMG 6867

 

5.11.22 - This project is complete. Waiting on power,

20213Binford copy

20213Binford2 copy

20213Binford3 copy

 

3.18.22 - The stucco is complete. The ceiling grid installation is underway, and the electricians are installing the lights,

20315 Binford Rd 7

20315 Binford Rd

20315 Binford Rd 3

20315 Binford Rd 4

 

3.02.22 - Crews have made great progress this month. The paving is complete and masonry has begun. Interior crews continue to hang sheetrock,

IMG 3109

IMG 3096

IMG 3094

IMG 3103

2.15.22 - Interior crews are hanging drywall and the concrete crewmen are forming the paving. The excavation of the business park's eastern retention pond is almost complete,

IMG 2992

IMG 2993

IMG 2994

IMG 2995

IMG 2996

IMG 2998

IMG 3002

IMG 3003

IMG 3004

 

1.19.22 - Erectors are sheeting the roof. Framers are framing the walls.

5

4

1

1.04.22 - Erectors are hanging steel for this new facility,

20213 Binford 4

20213 Binford 5

 

12.16.21 - Crews are preparing for the foundation pour,

6

1

 

11.11.21 - Site work is underway for a new 20,000 SF trade school, located at 20213 Binford Rd,

20213 Binford Rd

7

9

13

  3258 Hits
3258 Hits

4129 Katy Hockley Rd

4129 Katy Hockley Road | 8,600 SF PEMB | Katy, TX

6.02.22 - Power was turned on today, allowing the remaining trades to finish their work,

IMG 6747

IMG 6748

IMG 6749

IMG 6751

IMG 6756

IMG 6761

IMG 6766

IMG 6772

IMG 6803

 

3.03.22 - Interior build out continues. Windows are installed,

IMG 5211

4129 2

4129

 

2.08.22 - The building is sheeted. Erectors are installing the ridge vents. Framers have completed framing the office walls.

IMG 2974

IMG 2976

IMG 2979

 

12.22.21 - The foundation was poured today,

20211222 061204 resized

20211222 064312 resized

20211222 150459 resized

 

7/01/21 - This new 8,600 SF office and warehouse is in permitting. Construction updates will be available on this page, so check back for this location's progress and availablility.  

4129 Katy Hockley Rd thumb

4133 and 4129 Katy Hockley Rd 2

Spec Bldg 3 and 4 aerial

Spec Bldg 3 and 4 front thumb

  3279 Hits
3279 Hits

4133 Katy Hockley Rd

4133 Katy Hockley Road | 8,600 SF PEMB | Katy, TX

6.02.22 - Power was turned on today. Flooring and the ceiling tile installation will follow,

IMG 6806

IMG 6801

IMG 6798

IMG 6795

IMG 6792

IMG 6790

IMG 6787

IMG 6783

IMG 6781

IMG 6776

9

 

3.03.22 - Interior framing is underway,

4133

4133 2

4133 3

 

2.08.22 - Erectors began hanging the steel today,

4133 2

4133 3

4133 4

4133

7/01/21 - This new 8,600 SF office and warehouse is in permitting. Construction updates will be available on this page, so check back for this location's progress and availablility.  

4129 Katy Hockley Rd thumb

4133 and 4129 Katy Hockley Rd 2

Spec Bldg 3 and 4 aerial

Spec Bldg 3 and 4 front thumb

  2539 Hits
2539 Hits

Premier Cryogenics

Premier Cryogenics | Warehouse Bldg with Offsite Parking Lot and Additional Paving 

5.20.22 - Crewmen are pouring the offsite parking lot today,

PCPour3

PCPour2

5.11.22 - Crewmen are forming for the offsite parking lot. The next phases include a warehouse building and paving in the main yard,

PC phaseII 3

PC phaseII 2

  1765 Hits
1765 Hits

Independence Business Park

Independence Business Park (Finial Group)| 43,000 SF of New Office/Warehouses | Houston, TX

This project includes two ground-up spec office/warehouses totaling 43,000 SF. Scope of project also includes extending the business park's private drive and utilities.  

3.02.22 - Buildings 4 and 8 are completed,

6812 8 Bldg 8 2

6811 4 3

6812 8 Bldg 8 4

6812 8 Bldg 8 5

 

2.18.22 - Wrapping up work on Buildings 4 and 8,

9

5

2

4

6

11

 

12.29.21 - Stucco and masonry to begin. Landscaping continues for Bldg 4 and began today for Bldg 8. Electricians are digging up the underground conduit to AT&T's conduit at both bldgs,

12.29.21 2

12.29.21 3

12.29.21 4

12.29.21

 

12.23.21 - Ceiling tile installation continues for Buildings 4 & 8, fixtures are installed in both buildings, receptacles and can lights are going in today in both buildings, and crews are hooking up the condenser units for Buildings 4 and 8,

12.22.21 2

12.22.21

 

12.16.21 - Flooring continues,

12.16.21 3

12.16.21 2

12.16.21 4

12.16.21 5

12.16.21

11.05.21 - Waiting on one piece of glass to be installed above the door on Building 8. Plumbers are ready for fixtures as soon as the floors are installed. Electrial work continues for both buildings. 

DJI 0726

DJI 0725

DJI 0717

DJI 0706

 

 

 

10.29.21 - The OH door installation continues for Building 8. Plumbers are also installing the water heater and pipe for Building 8. Electricians continue their work on Buildings 4 and 8,

10.29.21

10.29.21 4

10.29.21 6

10.22.21 - Crews cleaned and backfilled around the seven new concrete drainage flumes. Crews are installing lights and ceiling grid in Buildng 4. Waiitng on AC materials for buildings 4 and 8,

Bldg4 1

Bldg4 2

Bldg4 3

Bldg8

Bldg8 3

Bldg8 5

 

9.07.21 - Northwinds crewmen are working to back fill the south side of Bldg 8, next to the drainage ditch, and dress it up. M&M Erectors continue the wall panel installation on Bldg 4,

Screenshot 2021 09 07 094643

Screenshot 2021 09 07 094549

Screenshot 2021 09 07 094706

Screenshot 2021 09 07 094720

Screenshot 2021 09 07 094738

Screenshot 2021 09 07 094752

Screenshot 2021 09 07 095130

 

8.24.21 - Erectors are lifting Bldg #4's roof,

BLDG4

BLDG4 8.24 2

BLDG4 8.24

 

8.18.21 - Paving was poured for Bldg #8. Erectors are lifting Bldg #4,

Bldg 8 paving

Bldg 8 paving 4

Bldg 8 paving 6

Bldg 4

Bldg 4 3

 

7.24.21 - Foundation was poured this morning for Bldg #4,

DJI 0187

DJI 0207

7.02.21 - Crewmen continue to lay out the sub-sub grade in the paving areas around Bldg. 4 & 8, and are cutting to grade to prepare for select fill,

Screenshot 2021 07 06 094600

Screenshot 2021 07 06 094631

Screenshot 2021 07 06 094651

Screenshot 2021 07 06 094703

 

6.25.21 - We are resuming select fill in the paving areas around pad #8. Cutting the paving sub grade in the west end of pad #4 to be able to get a minimum of 8” of select fill and compacted. Plumbers are backfilling trenches.

 

6.12.21 - Windrowing the select fill on Pad 4 and on Pad 8 to help pull the moisture out. Regrading and compacting to get ready for their test on Monday morning. Working on the ditch on the north side of BLDG. 8. Shaping and grading to drain to the pond inlet.

6.12.21

 

6.11.21 - Site crewmen are laying down the select fill that was stock piled yesterday on Pad 4 and began laying down the select fill that was stock piled yesterday on Pad 4. Crews started the first lift on pad 8, compacting in lifts. The plumbers continue working on the 8” water tie in and continued digging their trench. 

6.11.21

 

6.10.21 - Site crewmen began the select fill in Pad 4 and are compacting in lifts.

6.10.21

6.10.21 1

6.09.21 - Crews are cutting bldg. pad 4 & 8 to sub grade (in preparation for select fill). Running the 324 over pad 8 to compact it. Back filling stabilized. Back filling stabilized sand over the 2 culverts. Began the layout and grading on the north side ditch,

6.09.21 1

6.09.21

 

6.08.21 - Cutting bldg. pad 4 to sub grade and starting on pad 8 to prepare for select fill. Running the Roller and 324 over pad 4 to compact it.

6.08.21

6.08.21 1

 

6.07.21 - Starting the 24” & 15” coverts - excavating to grade, building up hdpe bed with stabilized sand, laying the pipe and back fill to 6” from top of pipe for city inspections. Cutting bldg. pad #4 to sub grade to prepare for select fill. 

6.07.21

 

 

  2942 Hits
2942 Hits

Connect Church

Connect Church | New 12,000 SF Facility | Montgomery, TX

1.26.22 - This was such a fun project. Below are final photos of their new church,

IMG 1768

IMG 1666

IMG 1787

IMG 1690

IMG 1704

IMG 1717

IMG 1720

IMG 1710

IMG 1728

IMG 1732

IMG 1714

IMG 1676

IMG 1803

IMG 1644

IMG 1650

IMG 1815

 

 

 

11.20.21 - This project is nearing completion. Floor installation is underway, as interior painting continues. Start-up crewmen are installing AC units. The final clean and completion are scheduled for next week,

IMG 0589

IMG 0532

IMG 0538

IMG 0545

IMG 0548

IMG 0556

IMG 0564

IMG 0569

IMG 0570

IMG 0572

IMG 0578

IMG 0579

IMG 0580

IMG 0583

IMG 0585

 

 

11.10.21 - Electricians are tieing in homeruns and pulling wire into the sanctuary, bathroom tile installation continues, and masons continue bricking the exterior. Erectors began trimming the building and plumbers set 5 septic tanks,

20211110 084810 photo 20211110 084800

20211108 071738 photo 20211108 071700

20211027 133438 photo 20211027 083400

20211027 133510 photo 20211027 083500

20211027 133525 photo 20211027 083500

20211028 131710 photo 20211028 081700

20211102 122947 photo 20211102 072900

20211104 140445 photo 20211104 090400

20211108 071524 photo 20211108 071500

20211109 071746 photo 20211109 071700

20211028 131810 photo 20211028 081800

20211110 084625 photo 20211110 084600

 

 

10.19.20 - The ceiling grid is installed and door frames are being installed,

ConnectChurch10.19 3

ConnectChurch10.19 10

ConnectChurch10.19 2

ConnectChurch10.19 4

ConnectChurch10.19 5

ConnectChurch10.19 6

ConnectChurch10.19 7

ConnectChurch10.19 8

ConnectChurch10.19 9

ConnectChurch10.19 11

ConnectChurch10.19 13

ConnectChurch10.19 14

ConnectChurch10.19 15

ConnectChurch10.19 16

ConnectChurch10.19

 

 

10.15.21 - The electricians are pulling wire as additional crews clean the site and reset the silt fence. The data wire is also being run.

20211015 121605 photo 20211015 071500

20211015 121632 photo 20211015 071600

20211015 121653 photo 20211015 071600

20211015 121713 photo 20211015 071700

20211015 122326 photo 20211015 072300

20211015 122340 photo 20211015 072300

20211015 122355 photo 20211015 072300

20211015 122424 photo 20211015 072400

 

9.12.21 - The glass is installed. Drywall, electrical, and HVAC work continue,

IMG 5736

IMG 5739

IMG 5748

IMG 5698

IMG 5751

IMG 5754

IMG 5709

IMG 5710

IMG 5711

IMG 5713

IMG 5714

IMG 5717

 

9.02.21 - Framers are hanging drywall. HVAC crewmen are hanging the ductwork,

IMG 2374

IMG 2375

IMG 2377

IMG 2384

IMG 2385

IMG 2386

IMG 2390

 

8.24.21 - The exterior walls are up and interior framing and buildout are underway,

 1946238176 20210824 151228 3137053 resized

1515713178 20210824 151145 3306461 resized

 89960966 20210824 151453 2315671 resized

 146295747 20210824 151434 2853758 resized

 918953949 20210824 151825 2866278 resized

 1118763360 20210824 151305 3651506 resized

 

8.04.21 - Erectors have progressed to hanging the pre-assembled roof sections,

8.04.21 10

8.04.21 7

8.04.21

 

8.02.21 - Erectors are into their second day hanging steel,

IMG 3565

IMG 3578

IMG 3593

IMG 3591

 

7.23.21 - The foundation is cured and saw cut. Steel delivery is scheduled for tomorrow,

ConnectChurch7.27 2

ConnectChurch7.27 3

ConnectChurch7.27 4

ConnectChurch7.27 5

ConnectChurch7.27

 

7.22.21 - Crews began pouring the foundation for the church building this morning,

ConnectChurchPour5

ConnectChurchPour11

 

7.01.21 - Crews laid out form boards, and finished digging grade beams. Electricians are working on underground electrical for the foundation.

ConnectChurch7.01

ConnectChurch7.01 2

6.30.21 - Electricians are laying out the underground electrical,

20210630 152021 photo 20210630 102000

20210630 152054 photo 20210630 102000

20210630 152103 photo 20210630 102100

20210630 152234 photo 20210630 102200

 

6.26.21 - The plumbers continue underground plumbing,

20210626 125234 photo 20210626 075200

20210626 125248 photo 20210626 075200

20210626 125350 photo 20210626 075300

6.24.21 - Underground plumbing continues,

20210624 153523 photo 20210624 103500

20210625 152216 photo 20210625 102200

20210625 152246 photo 20210625 102200

 

6.22.21 - Crewmen cleared shrubs along the drive for the future sign. Additional crews spread lime to speed the drying time of the job site, and laid out grade beam locations,

20210622 141801 photo 20210622 091700

20210623 145709 photo 20210623 095700

 

6.18.21 - Crewmen drilled and poured piers. Electricians installed conduit for light poles.

20210618 151251 photo 20210618 101200 copy

20210618 151205 photo 20210618 101200

 

5.14.21 - Curbs were poured for the parking area and have cured,

ConnectChurch curbs

ConnectChurch curbs2

ConnectChurch curbs3

ConnectChurch curbs4

 

4.27.21 - Crewmen are pouring the parking areas today,

CChurchPavingPour4.27.21 6

CChurchPavingPour4.27.21 24

 

3.16.21 - Crewmen continue their work on the pond outfall, digging out the second box, with stabilization, rest box and pipe, backfill, and dress up,

20210315 134322 photo 20210315 134300

20210315 091243 photo 20210315 091200

20210315 130913 photo 20210315 130900

20210315 130922 photo 20210315 130900

 

1.12.21 - Site crewmen continue excavating the detention pond and grading the site,

8

6

4

12.23.20 - Crews are clearing the site to prepare for the church's building pad,

ConnectChurch12.23 2

ConnectChurch12.23 3

ConnectChurch12.23 4

 

Sitework will soon begin for Connect Church's new 12,000 SF facility. The new church facility will include a sactuary, class rooms, and administrative offices,

02.1 Elevation

03.1 Interior sanctuary

  4897 Hits
4897 Hits

Word of God Christian Fellowship Church Sidewalk Extension

Word of God Christian Fellowship Church | Sidewalk Extension | Cypress, TX

8.24.21 - The sidewalk extension is complete for the Word of God Christian Fellowship Church congregation,

5

4

3

  3110 Hits
3110 Hits

EAB Dallas

Engineered Air Balance Co., Inc. | Remodel | Dallas, TX

7.16.21 - Photos of the completed project,

EAB 8

EAB 9

EAB 3

EAB 4

EAB 5

EAB 6

EAB 7

EAB 10

EAB 12

EAB 13

EAB 14

EAB 15

EAB 16

 

6.25.21 - Crews finished addressing the punch out items for this project.

EAB Final4 copy

EAB Final

EAB Final2

EAB Final3

EAB Final5

6.23.21 - Hanging generator enclosure doors and painting.

EAB

EAB 2

EAB 3

EAB 4

 

6.04.21 - Prepping for Generator pad pour,

EAB 6.04.21

6.02.21 - Electrical final called in for tomorrow.

EAB 6.02

6.01.21 - Started dropping ceiling tile and began final clean. Fire Marshall performed visual and hydro test. Approved to cover ceiling.

5.29.21 - Electricians are hanging lights, hanging new exterior wall packs

5.26.21 - Passed ADA inspection. Restroom stall doors are hung with hardware installed,

EAB 5.26.21

5.25.21 - Flooring crews are setting core base and addressing punch items. Fire Marshall visual is scheduled for June 1st. Furniture delivery is scheduled for June 7th.

5.24.21 - Electricians are labeling and tracing circuits. Concrete crew in to form and pour lab trough.

5.20.21 - Painters are painting out the walls. Plumber added a check valve on the circulating line. Electricians installed wiremold and plates.

5.19.21 - Crews are setting all window blinds. Painters are painting out all walls.

5.17.21 - Restroom mirrors are installed. Bad gaskets have been relaced on exterior windows. Glass sidelites are set. Electricians are setting devices. Painters are applying final coat.

5.14.21 - Crews are installing lavatories in break room and the copy room. Plumbers are finishing their fixture installations. Electricians are setting two fixtures in the restrooms,

EAB 5.14 2

EAB 5.14 3

EAB 5.14 7

EAB 5.14 4

EAB 5.14 5

EAB 5.14 6

EAB 5.14

 

5.04.21 - Electricians are tying in the lights. Sprinkler heads are being installed. Tile installation is underway in the restrooms and front store wall. Carpet is being installed on the West side.

EAB 5.04 2

EAB 5.04 3

EAB 5.04 4

EAB 5.04 5

EAB 5.04

 

5.03.21 - HVAC removed the existing rooftop units (RTUs) and set new RTUs. They also ran condensate lines, insulated vav's and copper linesets. Electricials set light fixtures and dropped whips into fixtures, and set pub panels in the electrical room. Fire sprinklers are being installed on grid, and the ceramic tile is being installed in the restrooms, and west office areas. The roofers started cricket on the North side, and are repairing the roof areas in the NE corner,

2021 05 03T08 00 37.000Z

2021 05 03T10 00 25.000Z

 

4.28.21 - Plumbing and Electrical rough-in are complete. Walls are taped and floated. Drywall crew are installing the ceiling grid. IT contractor is running data cabling,

9

8

10

2

 

3.16.21 - Crewmen began hanging duct work, and are saw cutting areas of slab to be removed for plumbing and electrical,

IMG 0327 20210316 031500

IMG 0326 20210316 031500

IMG 0325 20210316 031500

 

3.11.21 - This project includes remodeling 9,188 SF of office, 273 SF of lab space, and 679 SF of warehouse.

  3197 Hits
3197 Hits

4121 Katy Hockley Rd

4121 Katy Hockley Rd | 9,300 SF PEMB | Katy, TX

4.20.21 - The rock and concrete work are completed. Fence installation and clean up remain.

1

2

4.05.21 - Crewmen continue cutting grade,

4.05.21

4.05.21 2

3.26.21 -  Site crew began scraping for a new rock yard at 4121 Katy Hockley Rd. This is part of the new tenant’s improvemnets,

IMG 8014

IMG 8020

 

2.06.20 - This project is complete,

IMG 3668

IMG 3669

IMG 3671

IMG 3672

IMG 3673

IMG 3676

IMG 3679

IMG 3680

IMG 3682

 

12.15.19 - The building is fully trimmed. Flooring began in the entry,

IMG 8604

IMG 8607

IMG 8609

IMG 8612

IMG 8613

IMG 8616

IMG 8618

IMG 8620

IMG 8621

IMG 8624

IMG 8627

IMG 8630

IMG 8636

 

12.03.19 - Painting is complete and flooring will soon follow,

IMG 3503

IMG 3512

IMG 3513

IMG 3514

IMG 3515

IMG 3516

IMG 3517

IMG 3518

 

 

10.05.19 - Sheeting is underway,

IMG 7232

IMG 7234 

9.27.19 - Parking lot is poured. Erectors are hanging steel,

IMG 8724

IMG 8725

 

9.24.19 - Crews are erecting the building. More paving has been poured,

IMG 3333

IMG 3889

IMG 3890

 

9.12.19 - The building pad was poured and crews are forming for additional paving,

IMG 8598

IMG 8597

IMG 8600

IMG 8602

IMG 8603

 

7.16.19 - Crews are pouring the main drive,

IMG 3160

 

7.11.19 - Crewmen began building the pad and laying out the private road for the business park,

IMG 8122

IMG 8123

IMG 8126

IMG 8127

IMG 8128

 

6.28.19 - Sitework is underway for this new 9,300 SF office/warehouse, located off Katy Hockley Road and Clay Road. This new facility is available for Sale or Lease,

IMG 7812

IMG 7829

KH Exterior aerial2 4121 thumb

  6847 Hits
6847 Hits

Magellan Midstream Partners

Magellan Midstream Partners | 9,500 SF Freestanding Office and Control Center | Houston, TX

12.29.20 - This project was completed on Dec 2nd, with the exception of a few small items that are being wrapped up,

IMG 0517

IMG 0479

IMG 0518

IMG 0531

IMG 0549

IMG 0550

IMG 0552

IMG 0574

IMG 0575

IMG 0618

IMG 104

 

9.15.20 - Painters started applying the first coat of paint, and Site crewmen are making the final grade,

119513896 3870286709652798 8192365143876956359 o

119518843 3870286699652799 5056428671373765105 o

119522452 3870286689652800 4764239601070146737 o

119558215 3870286719652797 277720845147280050 o

119565518 3870286702986132 2840597188222595001 o

119587578 3870286726319463 1900187956359894981 o

119622378 3870286712986131 8064936732280126111 o

119643464 3870286742986128 364847143793880976 o

 

 

8.24.20 - Northwinds crewmen are laying base for an asphalt parking lot. Over the next two weeks, they will final grade around the building and prepare for the landscaping installation. The interior buildout continues.

IMG 4902

IMG 4901

IMG 4905

IMG 4911

IMG 4913

IMG 4915

IMG 4916

IMG 4917

IMG 4919

 

7.07.20 - Erectors continue to hang steel,

IMG 2338

IMG 2340

 

6.19.20 - The building was delivered.

 

6.17.20 - Crews are pouring the building pad,

20200617 135312850 iOS

6.10.20 - Site crewmen have completed the pad. Concrete crews began digging beams. Electricians are running service conduit,

IMG 0201

IMG 0202

IMG 0204

IMG 0205

IMG 0207

IMG 1621

 

12.27.19 - This project calls for a 9,500 SF Freestanding office and control center. The project is located in Midstream's existing terminal, on the East side of Houston. We are currently in the planning and permitting stage of this project.

  5327 Hits
5327 Hits

Ellington Trade Center

Ellington Trade Center | 110,015 SF Paving and Storm Utilities | Houston, TX

12.22.20 - Crewmen are painting stripes and joint sealing in the NW paving area. Crewmen are also removing existing parking stripes.

12.18.20 - Crews are painting stripes and joint sealing in SE paving area only.

12.07.20 - Crews are dewatering the site, spreading spoils, and loading materials and cleaning equipment. 

11.20.20 - The NE paving pour is underway,

20201120 020704

20201120 070239

20201120 070049

11.14.20 - Storm work continues,

IMG 16

IMG 17

11.11.20 - Crewmen are laying storm,

20201111 164838

20201111 164647

 

11.10.20 - 

20201110 175846

 

11.05.20 - Crews began pouring the paving this morning,

3

5

4

  3196 Hits
3196 Hits

FedEx Parking Lot Expansion

FedEx Distribution Center | Parking Lot Expansion | Webster, TX

12.11.20 - Crewmen are to hydroseed the areas surrounding the new paving, and install new light poles,

1

2

3

4

 

 

11.24.20 - The parking lot expansion is complete, just in time for FedEx's holiday rush season. Crews are back filing and sweeping,

1

2

3

4

11.17.20- Pour #1 of the south parking is complete. Crews are tying steel for Friday's pour,

1

3

4

5

6

7

11.10.20 - Crewmen are installing the catch basin, and setting forms for the south parking lot,

1

2

3

4

5

10.27.20 - Site crew continue the mass grading for the south parking lot expansion.

1

2

3

10.19.20 - Site crew began scraping and excavating for a 2.5-acre parking lot expansion,

5

6

7

8

  3369 Hits
3369 Hits

Duncan Aviation SR-8 Build Out

Duncan Aviation SR-8 Build Out

8.21.20 - This project is near completion,

20200730 072022 photo

20200730 072031 photo

20200803 063024 photo

20200803 063241 photo

20200803 063539 photo

20200805 090325 photo

IMG 3015

IMG 3016

IMG 7126

IMG 7130

 

7.27.20 - Crewmen are painting the plywood walls in 115 & 119, installing hardware on doors and starting the ceiling tile installation. Flooring crews have completed the VCT and cove base throughout Duncan's office areas. Electrical is complete and ready for inspection. Once the canopy is trimmed out, the remaining lighting will be completed,

7.25 2

7.25 3

7.25 4

7.25 5

7.25

7.27 2

7.27 3

7.27 4

7.27 5

7.27 7

7.27 8

7.27 9

7.27 10

7.27 11

7.27

 

 

7.20.20 - Interior painting continues. Electricians continue above-ceiling rough in and wiring of the electrical panels.

1

2

3

4

5

6

7

9

8

9

10

 

7.02.20 - Crewmen continue to run the ceiling grid and duct work. Electrical rough in has begun.

 

6.30.20 - Crews are running wall angle and hanging ceiling wires. They started running the ceiling grid. Crewmen are adding fire-rated plywood at the TV locations. AC contractor continues running hangers and assembling the AC ducts.

6.26 duncan 2

6.26 duncan 3

6.26 duncan 5

6.26 duncan 6

6.26 duncan 7

6.26 duncan 8

6.26 duncan 9

6.26 duncan 10

6.26 duncan 11

6.28.20 - This project calls for a 4,231 SF interior build out of an existing shell building (SR-8), that we constructed in 2019. Metal stud framing is underway. The Fire subcontractor began bringing the pipe drops to 1'-0" above the ceiling height.

1

2

3

4

  3682 Hits
3682 Hits

Grizzly

Grizzly | 35,000 SF Office/Warehouse | Waller, TX

8.14.20 - This project is complete,

IMG 9062

IMG 9067

IMG 9072

IMG 9078

IMG 9086

IMG 9089

IMG 9093

IMG 9111

IMG 9113

IMG 9117

IMG 9118

IMG 9120

IMG 9133

IMG 9134

IMG 9139

IMG 9141

IMG 9142

IMG 9152

IMG 9147

 

8.06.20 - Final clean is scheduled for next week,

5

1

3

2

4

 

7.07.20 - Waiting on power,

thumbnail IMG 4435

thumbnail IMG 4436

thumbnail IMG 4437

thumbnail IMG 4438

thumbnail IMG 4439

thumbnail IMG 4440

thumbnail IMG 4441

thumbnail IMG 4442

 

6.12.20 - Irrigation installation is underway. The crane installation is complete. Once this project has final power, crews will complete the AC, flooring, MEP trim out, and interior office painting,

thumbnail IMG 4367

thumbnail IMG 4366

thumbnail IMG 4365

5.29.20 - The entrance canopy is installed,

20200529 172816542 iOS

5.28.20 - Stone is complete and the interior walls are two sided, taped, and floated. AC grills will be completed today,

20200528 212521859 iOS

20200528 212449662 iOS

20200528 212410365 iOS

20200528 211646779 iOS

20200528 211633528 iOS

20200528 210553694 iOS

20200528 204910696 iOS

20200528 204712186 iOS

20200528 204727450 iOS

20200528 204831021 iOS

20200528 204835542 iOS

20200528 204850432 iOS

 

4.21.20 - Walls and roof are sheeted. The overhead doors are being installed, and the office framing, AC work, and plumbing rough in has begun,

4.21 grizzly3

4.21 grizzly

4.21 grizzly2

4.21 grizzly4

4.21 grizzly5

4.21 grizzly6

4.13.20 - The building is 60% complete. Crewmen started to frame the office. Paving and curbs are completed,

20200413 140858720 iOS

20200413 140539370 iOS

 

3.30.20 - Erectors continue to hang steel as additional crews prepare for next weeks pour,

20200330 152427116 iOS

20200330 151907978 iOS

20200330 151910825 iOS

 

3.25.20 - Erectors are unloading steel,

20200325 132752869 iOS 1

 

3.18.20 - The foundation was poured today,

20200318 120911923 iOS

20200318 172750541 iOS

 

3.13.20 - Plumbing and electrical groundout are waiting on inspections. Crews are digging grade beams and seting steel, preparing to pour next Wednesday,

1

2

4

3.11.20 - Crews are setting p the slab for next week's pour. Crews are also plumbing ground out for the fire line,

IMG 3831

IMG 3835

IMG 3833

IMG 3834

3.02.20 - Finishing up subgrade for paving. Steel has been delivered,

IMG 3795

IMG 3797

IMG 3796

 

2.20.20 - Crews finished installing the storm and will continue to form the pad,

IMG 4415

IMG 4416

IMG 4417

 

12.27.19 - Crews have begun sitework for Grizzly's new facility. Dennis Montesinos is the PM and Kenneth Whitmill is the Superintendent,

Grizzly12.27.19 4

Grizzly12.27.19

Grizzly12.27.19 5

  4585 Hits
Tags:
4585 Hits

Secor

Secor | Rock Yard | Cypress, TX

7.06.20 - We submitted the As-built certificates and are waiting for the final inspection. Centerpoint was onsite last week to set markers for the electrical service poles, for the lift station.

 

6.17.20 - Engs As-built inspection took place today. Once we receive the Engs As-built certificate, we can submit to Harris Co flood control and request final inspections for power release,

thumbnail IMG 4374

thumbnail IMG 4375

thumbnail IMG 4376

thumbnail IMG 4377

thumbnail IMG 4378

thumbnail IMG 4379

thumbnail IMG 4382

thumbnail IMG 4383

 

5.28.20 - Crewmen are pumping water to finish the storm water lift station.

20200526 180726232 iOS

20200526 180727544 iOS

20200526 180728821 iOS

20200526 180730572 iOS

5.11.20 - Rock yard is complete. Retention ponds are dry and final graded. Installing the last of the storm pipe lift station.

96708670 3476766299004843 6573054512854990848 n

96773710 3476766392338167 8458145732430397440 n

96813312 3476766522338154 6208415315592740864 n

96840585 3476766302338176 7599589702764593152 n

97010761 3476766519004821 8035157716529840128 n

97647587 3476766402338166 3159557640074297344 n

4.15.20 - Laying flex base for rock yard. Completing final dress up of retention ponds.

20200415 143743150 iOS

3.09.20 - Crewmen are cutting grades on the detention pond and storm swale,

IMG 3821

IMG 3822

 

3.02.20 - The pond is dried and crews are cutting grades,

secor3.02. thumb

 

2.21.20 - Crewmen continue to work on the pond. Grades have been cut and the storm as been installed. 

2

3

5

12.30.19 - Dennis Montesinos will soon oversee this project in Cypress, which calls for a two-acre rock yard. 

  4378 Hits
4378 Hits

E Squared Marine

E Squared Marine | 8,000 SF PEMB | Friendswood, TX

Completed project photos,

IMG 8153

IMG 8154

IMG 8172

thumbnail IMG 0229

IMG 8176

IMG 8179

IMG 8182

IMG 8188

IMG 8193

IMG 8196

IMG 8202

IMG 8203

IMG 8208

IMG 8211

IMG 8215

IMG 8220

IMG 8231

IMG 8233

IMG 8242

IMG 8265

IMG 8269

 

 

6.08.20 - Painting is near completion. This project will be completed next week, following landscaping,

17

1

2

5

8

10

12

13

14

18

19

22

 

5.07.20 - Masonry contractors completed the stucco. The wall tile in the restrooms is being installed. M&M Erectors are trimming the building and installing the entry canopy,

95272295 3466569990024474 4243787503628189696 n

95295638 3466570110024462 8884433601769242624 n

95474192 3466570053357801 5326933484940296192 n

95675362 3466570183357788 2841176185482772480 n

95699204 3466570040024469 806365635784212480 n

95709329 3466570120024461 3469914760022065152 n

95775764 3466569980024475 1370859303530921984 n

95840461 3466570193357787 3700212267938217984 n

95857786 3466569786691161 2353273187761913856 n

95876930 3466569653357841 8050737933734379520 n

95903514 3466569880024485 836828296921481216 n

96243266 3466569666691173 2498851469332054016 n

96394352 3466569886691151 8287555408164290560 n

 

4.30.20 - Painters completed their work painting the walls and ceilings. Door frames are being installed. The masonry contractor began the stucco facade,

94767637 3447937445221062 774851119976284160 n

95135831 3447937215221085 7100166202596524032 n

95139936 3447937221887751 4156402837758148608 n

95148798 3447937285221078 6149323643705884672 n

95311911 3447937135221093 263539566944714752 n

95345094 3447937358554404 3414423859867156480 n

95698576 3447937291887744 6088845526311108608 n

95035828 3447937068554433 6895275157108031488 n

 

4.23.20 - The entry canopy is complete. Painters are spraying the exposured structure. Electricians are building the service panels,

13

1

2

3

4

5

6

7

8

9

10

11

12

 

4.14.20 - AVAdek is installing the entry pergola. HVAC ductwork is being installed. Electricians are roughing in the plugs and switches,

93386803 3407481645933309 2434384100413407232 n

93421089 3407481955933278 5939305695756156928 n

93423777 3407482055933268 2872725159813316608 n

93425236 3407482079266599 358783533340164096 n

93426695 3407481979266609 8432734476819234816 n

93429694 3407481669266640 3420630577236148224 n

93473676 3407481849266622 6554092477056286720 n

93482197 3407481739266633 1657674191605858304 n

 

4.02.20 - Interior buildout continues, window and door installation are also underway,

20200401 121708000 iOS

20200401 122405000 iOS

 

3.10.20 - Roof sheeting and siding are underway,

IMG 0051

IMG 0052

IMG 0053

IMG 0054

IMG 0055

IMG 0056

IMG 0057

3.02.20 - Crewmen have finished sheeting the east wall,

IMG 4491

IMG 4492

IMG 4493

IMG 4494

 

2.27.20 - Erectors continue to hang steel, and began sheeting the east wall,

IMG 9845

IMG 9849

 

2.20.20 - The building is delivered and the erectors are shaking out and assembling the steel,

IMG 9654

IMG 9655

2.15.20 - Crews are pouring the foundation,

IMG 0350

IMG 0358

IMG 0360

2.11.20 - Crews are prepping for the foundation pour,

IMG 9636

IMG 9637

 

12.14.19 - Crewmen plan to pour paving on Monday,

E2 12.13

E2 12.13 7

E2 12.13 6

E2 12.13 2

 

12.12.19 - Site work continues,

E2 3

E2 5

E2

 

Crewmen will soon begin constructing a new 8,000 SF office building for E Squared Marine,

exterior thumb

Interior thumb

 

Continue reading
  5452 Hits
5452 Hits

Hoelscher Weatherstrip Manufacturing Co.

Hoelscher Weatherstrip | 192,000 SF Tiltwall Warehouse and 21,000 SF Office | Tomball, TX

4.08.20 - The facility's signs were installed on Friday. This project was completed.

IMG 5264

 

3.24.20 - The warehouse is being swept. Windows are being cleaned. This project is nearing completion,

IMG 4327

IMG 4164

IMG 4219

IMG 4170

IMG 4177

IMG 4182

IMG 4188

IMG 4208

IMG 4215

IMG 4228

IMG 4231

IMG 4238

IMG 4245

IMG 4252

IMG 4261

IMG 4266

IMG 4273

IMG 4285

IMG 4287

IMG 4306

 

3.09.20 - Lights are on. Landscaping and painting are underway. Flooring will soon follow,

IMG 3709

IMG 3557

IMG 3584

IMG 3605

IMG 3613

IMG 3616

IMG 3641

IMG 3644

IMG 3655

IMG 3673

IMG 3735

IMG 3752

 

2.21.20 - Painters are working on the offices. Cabinets, flooring, and landscaping are being installed,

IMG 9671

IMG 9673

IMG 9674

IMG 9675

IMG 9676

IMG 9677

IMG 9678

IMG 9679

IMG 9680

IMG 9681

IMG 9682

IMG 9683

IMG 9684

IMG 9686

IMG 9687

IMG 9688

IMG 9689

IMG 9690

IMG 9691

IMG 9692

IMG 9693

IMG 9694

IMG 9697

IMG 9698

1.17.20 - Crews are moving along with the interior buildout,

IMG 0595

IMG 0599

IMG 0603

IMG 0605

IMG 0609

IMG 0611

IMG 0612

IMG 0613

IMG 0617

IMG 0619

IMG 0621

IMG 0625

IMG 0627

IMG 0628

IMG 0632

IMG 0632

IMG 0634

IMG 0637

IMG 0639

IMG 0641

IMG 0645

IMG 0646

IMG 0650

IMG 0652

IMG 0654

IMG 0662

IMG 0683

IMG 0691

IMG 0693

 

12.30.19 - Erectors are trimming the facility and finishing the canopies. Interior buildout continues with electrical, framing, and drywall,

IMG 9772

IMG 9777

IMG 9792

IMG 9806

IMG 9810

IMG 9825

IMG 9826

IMG 9829

IMG 9845

 

12.04.19 - Erectors have one final section of roof to sheet. Crewmen continue to build out the interior as site crewmen prepare for the next paving pours,

IMG 7517

IMG 7520

IMG 7522

IMG 7524

IMG 7529

IMG 7533

IMG 7536

IMG 7537

IMG 7538

IMG 7539

IMG 7541

IMG 7542

IMG 7546

IMG 7550IMG 7562

IMG 7566

IMG 7611

 

11.15.19 - Exterior painting is underway and Erectors continue to sheet the roof. HVAC and interior framing is also underway,

IMG 4513

IMG 4516

IMG 4526

IMG 4527

IMG 4530

IMG 4536

10.28.19 - Erectors are sheeting the office side of the facility and will continue to hang roof sections tomorrow. The sprinkler system is being installed and crews are framing for the next paving pour,

IMG 3133

IMG 3142

IMG 3145

IMG 3147

IMG 3150

IMG 3152

IMG 3153

IMG 3159

IMG 3161

IMG 3165

IMG 3183

IMG 3196

 

10.01.19 - Crewmen are sheeting the roof,

IMG 8760

IMG 8761

IMG 8762

IMG 8763

 

9.13.19 - Crewmen are running the purlin straps, rubbing out the tilt-wall panels, welding the inbeds, and forming for Monday's paving pour, 

IMG 5695

IMG 4292

IMG 4312

IMG 4321

IMG 5696

IMG 5697

 

9.05.19 - The roof system is going up. The truck ramp is poured and Building G's grade beam was poured. The surveyer also began laying out the parking for crewmen to later form,

6

1

2

4

7

8

9

9

10

8.27.19 - Steel is being assembled and erected,

IMG 3712

IMG 3713

IMG 3714

IMG 3715

IMG 3716

IMG 3717

 

8.20.19 - Crews are lifting the tilt-wall panels,

IMG 3683

IMG 3693

IMG 3695

 

7.24.19 - Crews continue to prep the site for the next pour,

IMG 3547

IMG 9052

IMG 9060

IMG 9065

IMG 9066

 

7.12.19 - Crews began pouring the pad,

IMG 8147

IMG 8148 thumb

 

7.09.19 - Crews are making up the slab in preparation for Phase 1 of the foundation pour, scheduled for Friday,

IMG 8098

IMG 8088

IMG 8090

IMG 8094

IMG 8096

 

 

6.27.19 - Crewmen are dewatering so they can re-frame the pad,

IMG 7763

IMG 7762

IMG 7736

IMG 7727

 

6.17.19 - Electrical and Plumbing underground are underway. Crews are framing up the pad for the first pour.

3

6

7

 

6.03.19 - The building pad is 95% complete,

1

2

3

4

 

4.29.19 - The storm sewer is complete. The building pad has one lift, with two more to go,

4

7

14

15

16

 

4.09.19 - Crewmen are laying the storm on the North end. The building pad is 90% to start of fill elevation. The fire line and fire hydrant are set and approved by the fire marshall, and the domestic water tap and meter are set,

2

8

7

21

5

6

11

12

3.25.19 - Crews have completed the Stom on the South end, with the exception of tying into the downspout drains. Crews have hauled in  26 loads to tighten the SE corner of the building pad. The Storm on the East and NE side of the building is complete,

5

6

7

8

10

11

 

3.22.19 - Crews continue the mass grading and have laid approximately half of the strom drainage pipe,

IMG 7541

IMG 7542

IMG 7543

IMG 7544

IMG 7545

IMG 7546

IMG 7547

IMG 7548

3.11.19 - Storm on the south end is complete. Bringing in select fill for pad,

1

3

20190311 091142

20190311 091214

20190311 092221

2.27.19 - The brush grinding is complete. The storm on the south end is tied into the street inlet. South storm is 75% complete. Crewmen dug ditches around the building pad area to help release trapped water, and to more quickly dry the areas of saturated soils,

1

2

3

4

5

6

7

8

9

2.16.19 - Crews are installing the storm sewer and dewatering the site,

1

2

3

4

5

6

7

8

9

12

 

1.10.19 - Crewmen began clearing trees,

IMG 7254

IMG 7255

IMG 7257

IMG 7259

 

12.27.18 - Silt fencing is installed.

 

12.17.18 - Excavation is scheduled to begin in January. 

Hoelscher Gray1

Hoelscher Gray3

Hoelsher Gray 02

 

 

 

 

 

 

Continue reading
  8334 Hits
8334 Hits

SiteOne – Humble

SiteOne Landscape Supply - Humble

3.30.20 - This project is complete.

3.11.20 - Liner panel installation complete. Crews are installing insulation in the showroom.

3.09.20 - Crews were demoed today. Paving repairs and concrete pour scheduled for tomorrow.

3.03.20 - Crews are taping and floating office walls.

2.14.20 – Crews have begun a 9,850 SF building remodel for a new store.

  3728 Hits
Tags:
3728 Hits

Wilson Air North Ramp

  • 12.29.20 - This project includes 76,000 SF of new airplane parking space with full underground detention, to serve additional paving.

  • 12.30.19 – Crews continued from West to East direction cutting to grade. Removed concrete inlet top at the NW end for future drainage. Received the barriers for the West end protection, then set them up, filled with water and installed the lights.

  • 1.06.20 – Working the south west end stripping grass and excavating to grade

  • 2.15.20 – Grading the site in preparation for lime mixture on Monday, and compacting and blue-topping the NE section over the underground detention.

  • 3.02.20 - Crewmen are installing rebar

  • 3.06.20 - Fence removal and cleanup. Start pour.

  • 3.07.20 - Poured 1,000 yards

  • 3.08.20 - Cut control joints in paving, sawcutting

  3128 Hits
3128 Hits

Reliant Pest

2.24.20 - All inspections are approved and facility is clean.

2.19.20 - Dennis Montesinos expects this project for Reliant Pest Management to be completed next week. This facility was once a baseball batting cage facility. Crews are near completion on approximately 7,700 SF of new office buildout. This project included revising existing HVAC to the new floor plan, with added electrical service. Three restrooms with associated millwork were added, in addition to interior finishes

  3196 Hits